Sep 29, Kathmandu - The road has been blocked again due to a landslide near the Tuin Khola bridge on the Muglin-Narayangadh road section.
According to the Road Division Office, Bharatpur, two-way traffic has been closed at that location since 12 noon.
The office has stated that the landslide is still ongoing and the work of removing the landslide will resume only after it stops, as the landslide has stopped.
The office has also stated that equipment is being deployed from the division.
Last week, a landslide at the same location was cleared after 45 hours.
People going home to celebrate Dashain via this road section are facing problems this time due to the Tuin Khola landslide.
Vehicles moving westwards are now queuing up under the Muglin road.
Indian Rupee
U.S. Dollar
European Euro
UK Pound Sterling
Swiss Franc
Australian Dollar
Canadian Dollar
Singapore Dollar
Japanese Yen
Chinese Yuan
Saudi Arabian Riyal
Qatari Riyal
Thai Baht
UAE Dirham
Malaysian Ringgit
South Korean Won
Swedish Kroner
Danish Kroner
Hong Kong Dollar
Kuwaity Dinar
Bahrain Dinar